Waterproofing must be a continuous system, not a collection of separate sheets.
Membrane type and layer build-up are correctAccording to design
Seams are formed and testedMethod suitable for membrane
Upstands reach required heightAt parapets and penetrations
Corners and changes of plane are reinforcedNo fishmouths or tension points
Mechanical fastening / bonding is correctPattern and adhesion recorded
Section 006
Drainage
Water must have a continuous and clearly defined path off the roof.
Roof outlets are correctly locatedAt low points
Falls lead to outletsNo backfalls
Overflow provisions are presentWhere required by design
Outlets are securely sealedMembrane integration complete
Strainers and access are providedMaintenance possible
Ponding areas are recorded and resolvedBefore handover
Section 007
Flashings & Penetrations
Most leaks begin in the details.
Parapet and edge flashings are completeSecure and weather-tight
Penetrations use approved detailsPipes, ducts, supports and cables
Movement is accommodatedNo rigid tearing points
Metal joints and laps are correctDirection and allowance for expansion
Sealants are compatible and properly tooledCorrect backing and dimensions
Section 008
Roof Safety & Equipment
The roof must remain safe and maintainable after the works are completed.
Walkways and access routes are installedWhere required
Anchors and safety systems are documentedCertificates and locations
Equipment supports do not compromise waterproofingLoads and details checked
Snow guards and edge systems are completeWhere required
Maintenance access to outlets is clearNo obstruction
Section 009
Testing & Handover
The roof is accepted after the details, water path, and documentation have been checked.
Seams and details are inspected100% visual inspection
Water / integrity testing is completed where specifiedMethod and result recorded
Roof is clean and free of construction debrisOutlets clear
Defects are listed and correctedClosure verified
As-built photos and drawings are completeIncluding hidden layers
Maintenance instructions and warranties are deliveredClient archive complete
Normative basis
This checklist is an internal RAMERK tool. The applicable project documentation, Estonian legislation, EVS 920-5 where applicable, product-system instructions and manufacturer requirements remain controlling.
Inspector Notes
Observations & Actions
Inspector / Date
Contractor / Date
RCL-002
Roofing Inspection Checklist · RAMERK Checklists · Working Edition